DeltaQuad Evo Tactical Operations Manual
CtrlK
  • DeltaQuad Evo Tactical Edition
  • Safety and Legal Notice
  • Abbreviations
  • Vehicle Specifications
  • Auterion Suite
  • Setup
    • DeltaQuad Evo Flight Case
    • Field Deployment Kits
    • Assembly
    • DeltaQuad Evo Battery
    • Powering the Vehicle
    • Ground Control Station (GCS)
    • Safety Features
    • Air Unit Radio Swap
    • Connecting a Second GCS
    • ADS-B Receiver
    • Payload Manager
  • Flight
  • Maintenance
  • DeltaQuad Evo Payloads
Powered by GitBook
On this page

Setup

This chapter covers the basic hardware and software setup of the DeltaQuad Evo.

Chapter index

  • DeltaQuad Evo Flight Case

  • Field Deployment Kit

  • Assembly

  • DeltaQuad Evo Battery

    • Battery Handling

    • Charging the Battery

    • Storing the Battery

    • Main Battery Placement

    • Auxiliary Battery Placement

    • Empty Payload Box

  • Powering the Vehicle

  • Ground Control Station (GCS)

    • DeltaQuad Toughbook

    • Silvus StreamCaster 4240-EP

    • Connecting the GCS to the DeltaQuad Evo

    • Optional Tripod-Mounted Sector Antenna

    • Silvus StreamCaster GUI

    • ATAK-Setup

  • Safety Features

  • Air Unit Radio Swap

  • Connecting a Second GCS

  • ADS-B Receiver

  • Payload Manager

PreviousUsing the DeltaQuad Evo SimulatorNextDeltaQuad Evo Flight Case

Last updated 1 month ago