DeltaQuad Evo Government Edition Operations Manual
⌘Ctrlk
DeltaQuad Evo Government Edition Operations Manual
  • DeltaQuad Evo Government Edition
  • Safety and Legal Notice
  • Abbreviations
  • Vehicle Specifications
  • Auterion Suite
  • Setup
    • DeltaQuad Evo Flight Case
    • Assembly
    • DeltaQuad Evo Battery
    • Powering the Vehicle
    • Ground Control Station (GCS)
    • Safety Features
    • Air Unit Radio Swap
    • Connecting a Second GCS
    • ADS-B Receiver
    • Payload Manager
  • Flight
  • Maintenance
  • DeltaQuad Evo Payloads
Powered by GitBook
For the complete documentation index, see llms.txt. This page is also available as Markdown.

Setup

This chapter covers the basic hardware and software setup of the DeltaQuad Evo GOV.

Chapter index

  • DeltaQuad Evo Flight Case

  • Assembly

  • DeltaQuad Evo Battery

    • Battery Handling

    • Charging the Battery

    • Storing the Battery

    • Main Battery Placement

    • Auxiliary Battery Placement

    • Empty Payload Box

  • Powering the Vehicle

  • Ground Control Station (GCS)

    • DeltaQuad Toughbook

    • Silvus StreamCaster 4240-EP

    • Connecting the GCS to the DeltaQuad Evo

    • Optional Tripod-Mounted Sector Antenna

    • Silvus StreamCaster GUI

    • ATAK-Setup

  • Safety Features

  • Air Unit Radio Swap

  • Connecting a Second GCS

  • ADS-B Receiver

  • Payload Manager

PreviousUsing the DeltaQuad Evo SimulatorNextDeltaQuad Evo Flight Case

Last updated 10 months ago